Monday, January 14, 2008

MANUAL TESTING - New

MANUAL TESTING

1. What is the testing process?
Verifying that an input data produce the expected output.
2. What is the difference between testing and debugging?
Big difference is that debugging is conducted by a programmer and the programmer fix the errors during debugging phase. Tester never fixes the errors, but rather fined them and return to programmer.
3. What is the difference between structural and functional testing?
Structural is a "white box" testing and based on the algorithm or code. Functional testing is a "black box" (behavioral) testing where the tester verifies the functional specification.
4. What is a bug? What types of bugs do you know?
Bug is a error during execution of the program. There are two types of bugs: syntax and logical.
5. What is the difference between testing and quality assurance (QA)?
This question is surprisingly popular. However, the answer is quite simple. The goals of both are different: The goal of testing is to find the errors. The goal of QA is to prevent the errors in the program.
6. What kinds of testing do you know? What is it system testing? What is it integration testing? What is a unit testing? What is a regression testing?
You theoretical background and home work may shine in this question. System testing is a testing of the entire system as a whole. This is what user see and feels about the product you provide. Integration testing is the testing of integration of different modules of the system. Usually, the integration process is quite painful and this testing is the most serious one of all. Integration testing comes before system testing. Unit testing is a testing of a single unit (module) of within system. It's conducted before integration testing. Regression testing is a "backward check" testing. The idea to ensure that new functionality added to the system did not break old, checked, functionality of the system.
7. What are all the major processes will involve in testing?
The major processes include:
1.Planning (test strategy, test objectives, risk management)
2.Design (functions to be tested, test scenario, test cases)
3Development (test procedures, test scripts, test environment)
4.Execution (execute test)
5.Evaluation (evaluate test results, compare actual results with expected results)
8. Could you test a program 100%? 90%? Why?
Definitely not! The major problem with testing that you cannot calculate how many errors are in the code, functioning etc. There are many factors involved such as experience of programmer, complexity of the system etc.
9. How would you test a mug (chair/table/gas station etc.)?
First of all you must demand requirements and functional specification and design document of the mug. There will find requirements like ability to hold hot water, waterproof, stability, break ability and so on. Then you should test the mug according to all documents.
10. How would you conduct your test?
Each test is based on the technical requirements of the software product.
11.What is the other name for white box testing?
Clear box testing
12.What is other name for water fall model?
Linear sequential model
13.What is considered a good test?
It should cover most of the object's functionality
14.What is 'Software Quality Assurance'?
Software QA involves the entire software development PROCESS - monitoring and improving the process, making sure that any agreed-upon standards and procedures are followed, and ensuring that problems are found and dealt with.
15.What is 'Software Testing'?
Testing involves operation of a system or application under controlled conditions and evaluating the results (eg, 'if the user is in interface A of the application while using hardware B, and does C, then D should happen'). The controlled conditions should include both normal and abnormal conditions. Testing should intentionally attempt to make things go wrong to determine if things happen when they shouldn't or things don't happen when they should.
16.What are some recent major computer system failures caused by software bugs?
• In March of 2002 it was reported that software bugs in Britain's national tax system resulted in more than 100,000 erroneous tax overcharges. The problem was partly attibuted to the difficulty of testing the integration of multiple systems.
• A newspaper columnist reported in July 2001 that a serious flaw was found in off-the-shelf software that had long been used in systems for tracking certain U.S. nuclear materials. The same software had been recently donated to another country to be used in tracking their own nuclear materials, and it was not until scientists in that country discovered the problem, and shared the information, that U.S. officials became aware of the problems.
• According to newspaper stories in mid-2001, a major systems development contractor was fired and sued over problems with a large retirement plan management system. According to the reports, the client claimed that system deliveries were late, the software had excessive defects, and it caused other systems to crash.
• In January of 2001 newspapers reported that a major European railroad was hit by the aftereffects of the Y2K bug. The company found that many of their newer trains would not run due to their inability to recognize the date '31/12/2000'; the trains were started by altering the control system's date settings.
• News reports in September of 2000 told of a software vendor settling a lawsuit with a large mortgage lender; the vendor had reportedly delivered an online mortgage processing system that did not meet specifications, was delivered late, and didn't work.
• In early 2000, major problems were reported with a new computer system in a large suburban U.S. public school district with 100,000+ students; problems included 10,000 erroneous report cards and students left stranded by failed class registration systems; the district's CIO was fired. The school district decided to reinstate it's original 25-year old system for at least a year until the bugs were worked out of the new system by the software vendors.
• In October of 1999 the $125 million NASA Mars Climate Orbiter spacecraft was believed to be lost in space due to a simple data conversion error. It was determined that spacecraft software used certain data in English units that should have been in metric units. Among other tasks, the orbiter was to serve as a communications relay for the Mars Polar Lander mission, which failed for unknown reasons in December 1999. Several investigating panels were convened to determine the process failures that allowed the error to go undetected.
• Bugs in software supporting a large commercial high-speed data network affected 70,000 business customers over a period of 8 days in August of 1999. Among those affected was the electronic trading system of the largest U.S. futures exchange, which was shut down for most of a week as a result of the outages.
• In April of 1999 a software bug caused the failure of a $1.2 billion military satellite launch, the costliest unmanned accident in the history of Cape Canaveral launches. The failure was the latest in a string of launch failures, triggering a complete military and industry review of U.S. space launch programs, including software integration and testing processes. Congressional oversight hearings were requested.
• A small town in Illinois received an unusually large monthly electric bill of $7 million in March of 1999. This was about 700 times larger than its normal bill. It turned out to be due to bugs in new software that had been purchased by the local power company to deal with Y2K software issues.
• In early 1999 a major computer game company recalled all copies of a popular new product due to software problems. The company made a public apology for releasing a product before it was ready.
• The computer system of a major online U.S. stock trading service failed during trading hours several times over a period of days in February of 1999 according to nationwide news reports. The problem was reportedly due to bugs in a software upgrade intended to speed online trade confirmations.
• In April of 1998 a major U.S. data communications network failed for 24 hours, crippling a large part of some U.S. credit card transaction authorization systems as well as other large U.S. bank, retail, and government data systems. The cause was eventually traced to a software bug.
• January 1998 news reports told of software problems at a major U.S. telecommunications company that resulted in no charges for long distance calls for a month for 400,000 customers. The problem went undetected until customers called up with questions about their bills.
• In November of 1997 the stock of a major health industry company dropped 60% due to reports of failures in computer billing systems, problems with a large database conversion, and inadequate software testing. It was reported that more than $100,000,000 in receivables had to be written off and that multi-million dollar fines were levied on the company by government agencies.
• A retail store chain filed suit in August of 1997 against a transaction processing system vendor (not a credit card company) due to the software's inability to handle credit cards with year 2000 expiration dates.
• In August of 1997 one of the leading consumer credit reporting companies reportedly shut down their new public web site after less than two days of operation due to software problems. The new site allowed web site visitors instant access, for a small fee, to their personal credit reports. However, a number of initial users ended up viewing each others' reports instead of their own, resulting in irate customers and nationwide publicity. The problem was attributed to "...unexpectedly high demand from consumers and faulty software that routed the files to the wrong computers."
• In November of 1996, newspapers reported that software bugs caused the 411 telephone information system of one of the U.S. RBOC's to fail for most of a day. Most of the 2000 operators had to search through phone books instead of using their 13,000,000-listing database. The bugs were introduced by new software modifications and the problem software had been installed on both the production and backup systems. A spokesman for the software vendor reportedly stated that 'It had nothing to do with the integrity of the software. It was human error.'
• On June 4 1996 the first flight of the European Space Agency's new Ariane 5 rocket failed shortly after launching, resulting in an estimated uninsured loss of a half billion dollars. It was reportedly due to the lack of exception handling of a floating-point error in a conversion from a 64-bit integer to a 16-bit signed integer.
• Software bugs caused the bank accounts of 823 customers of a major U.S. bank to be credited with $924,844,208.32 each in May of 1996, according to newspaper reports. The American Bankers Association claimed it was the largest such error in banking history. A bank spokesman said the programming errors were corrected and all funds were recovered.
• Software bugs in a Soviet early-warning monitoring system nearly brought on nuclear war in 1983, according to news reports in early 1999. The software was supposed to filter out false missile detections caused by Soviet satellites picking up sunlight reflections off cloud-tops, but failed to do so. Disaster was averted when a Soviet commander, based on a what he said was a '...funny feeling in my gut', decided the apparent missile attack was a false alarm. The filtering software code was rewritten.
17.Why is it often hard for management to get serious about quality assurance?
Solving problems is a high-visibility process; preventing problems is low-visibility. This is illustrated by an old parable:
In ancient China there was a family of healers, one of whom was known throughout the land and employed as a physician to a great lord. The physician was asked which of his family was the most skillful healer. He replied,
"I tend to the sick and dying with drastic and dramatic treatments, and on occasion someone is cured and my name gets out among the lords."
"My elder brother cures sickness when it just begins to take root, and his skills are known among the local peasants and neighbors."
"My eldest brother is able to sense the spirit of sickness and eradicate it before it takes form. His name is unknown outside our home."
18.Why does software have bugs?
•miscommunication or no communication - as to specifics of what an application should or shouldn't do (the application's requirements).
•software complexity - the complexity of current software applications can be difficult to comprehend for anyone without experience in modern-day software development. Windows-type interfaces, client-server and distributed applications, data communications, enormous relational databases, and sheer size of applications have all contributed to the exponential growth in software/system complexity. And the use of object-oriented techniques can complicate instead of simplify a project unless it is well-engineered.
•programming errors - programmers, like anyone else, can make mistakes.
• changing requirements - the customer may not understand the effects of changes, or may understand and request them anyway - redesign, rescheduling of engineers, effects on other projects, work already completed that may have to be redone or thrown out, hardware requirements that may be affected, etc. If there are many minor changes or any major changes, known and unknown dependencies among parts of the project are likely to interact and cause problems, and the complexity of keeping track of changes may result in errors. Enthusiasm of engineering staff may be affected. In some fast-changing business environments, continuously modified requirements may be a fact of life. In this case, management must understand the resulting risks, and QA and test engineers must adapt and plan for continuous extensive testing to keep the inevitable bugs from running out of control .
• time pressures - scheduling of software projects is difficult at best, often requiring a lot of guesswork. When deadlines loom and the crunch comes, mistakes will be made.
• egos - people prefer to say things like:
'no problem' 'piece of cake'
'I can whip that out in a few hours'
'it should be easy to update that old code'
instead of:'that adds a lot of complexity and we could end up
making a lot of mistakes'
'we have no idea if we can do that; we'll wing it'
'I can't estimate how long it will take, until I
take a close look at it'
'we can't figure out what that old spaghetti code
did in the first place'
If there are too many unrealistic 'no problem's', the
result is bugs.
• poorly documented code - it's tough to maintain and modify code that is badly written or poorly documented; the result is bugs. In many organizations management provides no incentive for programmers to document their code or write clear, understandable code. In fact, it's usually the opposite: they get points mostly for quickly turning out code, and there's job security if nobody else can understand it ('if it was hard to write, it should be hard to read').
•software development tools - visual tools, class libraries, compilers, scripting tools, etc. often introduce their own bugs or are poorly documented, resulting in added bugs.
19.How can new Software QA processes be introduced in an existing organization?
•A lot depends on the size of the organization and the risks involved. For large organizations with high-risk (in terms of lives or property) projects, serious management buy-in is required and a formalized QA process is necessary.
•Where the risk is lower, management and organizational buy-in and QA implementation may be a slower, step-at-a-time process. QA processes should be balanced with productivity so as to keep bureaucracy from getting out of hand.
•For small groups or projects, a more ad-hoc process may be appropriate, depending on the type of customers and projects. A lot will depend on team leads or managers, feedback to developers, and ensuring adequate communications among customers, managers, developers, and testers.
•In all cases the most value for effort will be in requirements management processes, with a goal of clear, complete, testable requirement specifications or expectations.
20.What is verification? validation?
Verification typically involves reviews and meetings to evaluate documents, plans, code, requirements, and specifications. This can be done with checklists, issues lists, walkthroughs, and inspection meetings. Validation typically involves actual testing and takes place after verifications are completed. The term 'IV & V' refers to Independent Verification and Validation.
21.What is a 'walkthrough'?
A 'walkthrough' is an informal meeting for evaluation or informational purposes. Little or no preparation is usually required.
22.What's an 'inspection'?
An inspection is more formalized than a 'walkthrough', typically with 3-8 people including a moderator, reader, and a recorder to take notes. The subject of the inspection is typically a document such as a requirements spec or a test plan, and the purpose is to find problems and see what's missing, not to fix anything. Attendees should prepare for this type of meeting by reading thru the document; most problems will be found during this preparation. The result of the inspection meeting should be a written report. Thorough preparation for inspections is difficult, painstaking work, but is one of the most cost effective methods of ensuring quality. Employees who are most skilled at inspections are like the 'eldest brother' in the parable in Their skill may have low visibility but they are extremely valuable to any software development organization, since bug prevention is far more cost-effective than bug detection.
23.What kinds of testing should be considered?
•Black box testing - not based on any knowledge of internal design or code. Tests are based on requirements and functionality.
•White box testing - based on knowledge of the internal logic of an application's code. Tests are based on coverage of code statements, branches, paths, conditions.
•unit testing - the most 'micro' scale of testing; to test particular functions or code modules. Typically done by the programmer and not by testers, as it requires detailed knowledge of the internal program design and code. Not always easily done unless the application has a well-designed architecture with tight code; may require developing test driver modules or test harnesses.
•incremental integration testing - continuous testing of an application as new functionality is added; requires that various aspects of an application's functionality be independent enough to work separately before all parts of the program are completed, or that test drivers be developed as needed; done by programmers or by testers.
•integration testing - testing of combined parts of an application to determine if they function together correctly. The 'parts' can be code modules, individual applications, client and server applications on a network, etc. This type of testing is especially relevant to client/server and distributed systems.
•functional testing - black-box type testing geared to functional requirements of an application; this type of testing should be done by testers. This doesn't mean that the programmers shouldn't check that their code works before releasing it (which of course applies to any stage of testing.)
•system testing - black-box type testing that is based on overall requirements specifications; covers all combined parts of a system.
•end-to-end testing - similar to system testing; the 'macro' end of the test scale; involves testing of a complete application environment in a situation that mimics real-world use, such as interacting with a database, using network communications, or interacting with other hardware, applications, or systems if appropriate.
•sanity testing - typically an initial testing effort to determine if a new software version is performing
•well enough to accept it for a major testing effort. For example, if the new software is crashing systems every 5 minutes, bogging down systems to a crawl, or destroying databases, the software may not be in a 'sane' enough condition to warrant further testing in its current state.
•regression testing - re-testing after fixes or modifications of the software or its environment. It can be difficult to determine how much re-testing is needed, especially near the end of the development cycle. Automated testing tools can be especially useful for this type of testing.
•acceptance testing - final testing based on specifications of the end-user or customer, or based on use by end-users/customers over some limited period of time.
•load testing - testing an application under heavy loads, such as testing of a web site under a range of loads to determine at what point the system's response time degrades or fails.
•stress testing - term often used interchangeably with 'load' and 'performance' testing. Also used to describe such tests as system functional testing while under unusually heavy loads, heavy repetition of certain actions or inputs, input of large numerical values, large complex queries to a database system, etc.
•performance testing - term often used interchangeably with 'stress' and 'load' testing. Ideally 'performance' testing (and any other 'type' of testing) is defined in requirements documentation or QA or Test Plans.
•usability testing - testing for 'user-friendliness'. Clearly this is subjective, and will depend on the targeted end-user or customer. User interviews, surveys, video recording of user sessions, and other techniques can be used. Programmers and testers are usually not appropriate as usability testers.
•install/uninstall testing - testing of full, partial, or upgrade install/uninstall processes.
•recovery testing - testing how well a system recovers from crashes, hardware failures, or other catastrophic problems.
•security testing - testing how well the system protects against unauthorized internal or external access, willful damage, etc; may require sophisticated testing techniques.
•compatability testing - testing how well software performs in a particular hardware/software/operating system/network/etc. environment.
•exploratory testing - often taken to mean a creative, informal software test that is not based on formal test plans or test cases; testers may be learning the software as they test it.
•ad-hoc testing - similar to exploratory testing, but often taken to mean that the testers have significant understanding of the software before testing it.
•user acceptance testing - determining if software is satisfactory to an end-user or customer.
•comparison testing - comparing software weaknesses and strengths to competing products.
•alpha testing - testing of an application when development is nearing completion; minor design changes may still be made as a result of such testing. Typically done by end-users or others, not by programmers or testers.
•beta testing - testing when development and testing are essentially completed and final bugs and problems need to be found before final release. Typically done by end-users or others, not by programmers or testers.
•mutation testing - a method for determining if a set of test data or test cases is useful, by deliberately introducing various code changes ('bugs') and retesting with the original test data/cases to determine if the 'bugs' are detected. Proper implementation requires large computational resources.
24.What are 5 common problems in the software development process?
•poor requirements - if requirements are unclear, incomplete, too general, or not testable, there will be problems.
•unrealistic schedule - if too much work is crammed in too little time, problems are inevitable.
•inadequate testing - no one will know whether or not the program is any good until the customer complains or systems crash.
•featuritis - requests to pile on new features after development is underway; extremely common.
•miscommunication - if developers don't know what's needed or customer's have erroneous expectations, problems are guaranteed.
25.What are 5 common solutions to software development problems?
•solid requirements - clear, complete, detailed, cohesive, attainable, testable requirements that are agreed to by all players. Use prototypes to help nail down requirements.
•realistic schedules - allow adequate time for planning, design, testing, bug fixing, re-testing, changes, and documentation; personnel should be able to complete the project without burning out.
•adequate testing - start testing early on, re-test after fixes or changes, plan for adequate time for testing and bug-fixing.
•stick to initial requirements as much as possible - be prepared to defend against changes and additions once development has begun, and be prepared to explain consequences. If changes are necessary, they should be adequately reflected in related schedule changes. If possible, use rapid prototyping during the design phase so that customers can see what to expect. This will provide them a higher comfort level with their requirements decisions and minimize changes later on.
•communication - require walkthroughs and inspections when appropriate; make extensive use of group communication tools - e-mail, groupware, networked bug- tracking tools and change management tools, intranet capabilities, etc.; insure that documentation is available and up-to-date - preferably electronic, not paper; promote teamwork and cooperation; use protoypes early on so that customers' expectations are clarified.
26.What is software 'quality'?
Quality software is reasonably bug-free, delivered on time and within budget, meets requirements and/or expectations, and is maintainable. However, quality is obviously a subjective term. It will depend on who the 'customer' is and their overall influence in the scheme of things. A wide-angle view of the 'customers' of a software development project might include end-users, customer acceptance testers, customer contract officers, customer management, the development organization's management/accountants/testers/salespeople, future software maintenance engineers, stockholders, magazine columnists, etc. Each type of 'customer' will have their own slant on 'quality' - the accounting department might define quality in terms of profits while an end-user might define quality as user-friendly and bug-free.
27.What is 'good code'?
'Good code' is code that works, is bug free, and is readable and maintainable. Some organizations have coding 'standards' that all developers are supposed to adhere to, but everyone has different ideas about what's best, or what is too many or too few rules. There are also various theories and metrics, such as McCabe Complexity metrics. It should be kept in mind that excessive use of standards and rules can stifle productivity and creativity. 'Peer reviews', 'buddy checks' code analysis tools, etc. can be used to check for problems and enforce standards.
For C and C++ coding, here are some typical ideas to consider in setting rules/standards; these may or may not apply to a particular situation:
•minimize or eliminate use of global variables.
•use descriptive function and method names - use both upper and lower case, avoid abbreviations, use as many characters as necessary to be adequately descriptive (use of more than 20 characters is not out of line); be consistent in naming conventions.
•use descriptive variable names - use both upper and lower case, avoid abbreviations, use as many characters as necessary to be adequately descriptive (use of more than 20 characters is not out of line); be consistent in naming conventions.
•function and method sizes should be minimized; less than 100 lines of code is good, less than 50 lines is preferable.
•function descriptions should be clearly spelled out in comments preceding a function's code.
•organize code for readability.
•use whitespace generously - vertically and horizontally
•each line of code should contain 70 characters max.
•one code statement per line.
•coding style should be consistent throught a program (eg, use of brackets, indentations, naming conventions, etc.)
•in adding comments, err on the side of too many rather than too few comments; a common rule of thumb is that there should be at least as many lines of comments (including header blocks) as lines of code.
•no matter how small, an application should include documentaion of the overall program function and flow (even a few paragraphs is better than nothing); or if possible a separate flow chart and detailed program documentation.
•make extensive use of error handling procedures and status and error logging.
•for C++, to minimize complexity and increase maintainability, avoid too many levels of inheritance in class heirarchies (relative to the size and complexity of the application). Minimize use of multiple inheritance, and minimize use of operator overloading (note that the Java programming language eliminates multiple inheritance and operator overloading.)
• for C++, keep class methods small, less than 50 lines of code per method is preferable.
• for C++, make liberal use of exception handlers
28.What is 'good design'?
'Design' could refer to many things, but often refers to 'functional design' or 'internal design'. Good internal design is indicated by software code whose overall structure is clear, understandable, easily modifiable, and maintainable; is robust with sufficient error-handling and status logging capability; and works correctly when implemented. Good functional design is indicated by an application whose functionality can be traced back to customer and end-user requirements.For programs that have a user interface, it's often a good idea to assume that the end user will have little computer knowledge and may not read a user manual or even the on-line help; some common rules-of-thumb include:
• the program should act in a way that least surprises the user
• it should always be evident to the user what can be done next and how to exit
• the program shouldn't let the users do something stupid without warning them.
29.What is SEI? CMM? ISO? IEEE? ANSI? Will it help?
•SEI = 'Software Engineering Institute' at Carnegie-Mellon University; initiated by the U.S. Defense Department to help improve software development processes.
•CMM = 'Capability Maturity Model', developed by the SEI. It's a model of 5 levels of organizational 'maturity' that determine effectiveness in delivering quality software. It is geared to large organizations such as large U.S. Defense Department contractors. However, many of the QA processes involved are appropriate to any organization, and if reasonably applied can be helpful. Organizations can receive CMM ratings by undergoing assessments by qualified auditors.
Level 1 - characterized by chaos, periodic panics, and heroic
efforts required by individuals to successfully
complete projects. Few if any processes in place;
successes may not be repeatable.
Level 2 - software project tracking, requirements management,
realistic planning, and configuration management
processes are in place; successful practices can
be repeated.
Level 3 - standard software development and maintenance processes
are integrated throughout an organization; a Software
Engineering Process Group is is in place to oversee
software processes, and training programs are used to
ensure understanding and compliance.
Level 4 - metrics are used to track productivity, processes,
and products. Project performance is predictable,
and quality is consistently high.
Level 5 - the focus is on continouous process improvement. The
impact of new processes and technologies can be
predicted and effectively implemented when required.
Perspective on CMM ratings: During 1997-2001, 1018 organizations
were assessed. Of those, 27% were rated at Level 1, 39% at 2,
23% at 3, 6% at 4, and 5% at 5. (For ratings during the period
1992-96, 62% were at Level 1, 23% at 2, 13% at 3, 2% at 4, and
0.4% at 5.) The median size of organizations was 100 software
engineering/maintenance personnel; 32% of organizations were
U.S. federal contractors or agencies. For those rated at
Level 1, the most problematical key process area was in
Software Quality Assurance.
• ISO = 'International Organisation for Standardization' - The ISO 9001:2000 standard (which replaces the previous standard of 1994) concerns quality systems that are assessed by outside auditors, and it applies to many kinds of production and manufacturing organizations, not just software. It covers documentation, design, development, production, testing, installation, servicing, and other processes. The full set of standards consists of: (a)Q9001-2000 - Quality Management Systems: Requirements; (b)Q9000-2000 - Quality Management Systems: Fundamentals and Vocabulary; (c)Q9004-2000 - Quality Management Systems: Guidelines for Performance Improvements. To be ISO 9001 certified, a third-party auditor assesses an organization, and certification is typically good for about 3 years, after which a complete reassessment is required. Note that ISO certification does not necessarily indicate quality products - it indicates only that documented processes are followed.
• IEEE = 'Institute of Electrical and Electronics Engineers' - among other things, creates standards such as 'IEEE Standard for Software Test Documentation' (IEEE/ANSI Standard 829), 'IEEE Standard of Software Unit Testing (IEEE/ANSI Standard 1008), 'IEEE Standard for Software Quality Assurance Plans' (IEEE/ANSI Standard 730), and others.
• ANSI = 'American National Standards Institute', the primary industrial standards body in the U.S.; publishes some software-related standards in conjunction with the IEEE and ASQ (American Society for Quality).
• Other software development process assessment methods besides CMM and ISO 9000 include SPICE, Trillium, TickIT. and Bootstrap.
30. What is the 'software life cycle'?
The life cycle begins when an application is first conceived and ends when it is no longer in use. It includes aspects such as initial concept, requirements analysis, functional design, internal design, documentation planning, test planning, coding, document preparation, integration, testing, maintenance, updates, retesting, phase-out, and other aspects
31.Will automated testing tools make testing easier?
•Possibly. For small projects, the time needed to learn and implement them may not be worth it. For larger projects, or on-going long-term projects they can be valuable.
•A common type of automated tool is the 'record/playback' type. For example, a tester could click through all combinations of menu choices, dialog box choices, buttons, etc. in an application GUI and have them 'recorded' and the results logged by a tool. The 'recording' is typically in the form of text based on a scripting language that is interpretable by the testing tool. If new buttons are added, or some underlying code in the application is changed, etc. the application can then be retested by just 'playing back' the 'recorded' actions, and comparing the logging results to check effects of the changes. The problem with such tools is that if there are continual changes to the system being tested, the 'recordings' may have to be changed so much that it becomes very time-consuming to continuously update the scripts. Additionally, interpretation of results (screens, data, logs, etc.) can be a difficult task. Note that there are record/playback tools for text-based interfaces also, and for all types of platforms.
•Other automated tools can include:
code analyzers - monitor code complexity, adherence to
standards, etc.
coverage analyzers - these tools check which parts of the
code have been exercised by a test, and may
be oriented to code statement coverage,
condition coverage, path coverage, etc.
memory analyzers - such as bounds-checkers and leak detectors.
load/performance test tools - for testing client/server
and web applications under various load
levels.
web test tools - to check that links are valid, HTML code
usage is correct, client-side and
server-side programs work, a web site's
interactions are secure.
other tools - for test case management, documentation
management, bug reporting, and configuration
management.

32.What makes a good test engineer?
A good test engineer has a 'test to break' attitude, an ability to take the point of view of the customer, a strong desire for quality, and an attention to detail. Tact and diplomacy are useful in maintaining a cooperative relationship with developers, and an ability to communicate with both technical (developers) and non-technical (customers, management) people is useful. Previous software development experience can be helpful as it provides a deeper understanding of the software development process, gives the tester an appreciation for the developers' point of view, and reduce the learning curve in automated test tool programming. Judgement skills are needed to assess high-risk areas of an application on which to focus testing efforts when time is limited.
33.What makes a good Software QA engineer?
The same qualities a good tester has are useful for a QA engineer. Additionally, they must be able to understand the entire software development process and how it can fit into the business approach and goals of the organization. Communication skills and the ability to understand various sides of issues are important. In organizations in the early stages of implementing QA processes, patience and diplomacy are especially needed. An ability to find problems as well as to see 'what's missing' is important for inspections and reviews.
34.What makes a good QA or Test manager?
A good QA, test, or QA/Test(combined) manager should:
• be familiar with the software development process
• be able to maintain enthusiasm of their team and promote a positive atmosphere, despite what is a somewhat 'negative' process (e.g., looking for or preventing problems)
• be able to promote teamwork to increase productivity
• be able to promote cooperation between software, test, and QA engineers
• have the diplomatic skills needed to promote improvements in QA processes
• have the ability to withstand pressures and say 'no' to other managers when quality is insufficient or QA processes are not being adhered to
• have people judgement skills for hiring and keeping skilled personnel
• be able to communicate with technical and non-technical people, engineers, managers, and customers.
• be able to run meetings and keep them focused
35.What's the role of documentation in QA?
Critical. (Note that documentation can be electronic, not necessarily paper.) QA practices should be documented such that they are repeatable. Specifications, designs, business rules, inspection reports, configurations, code changes, test plans, test cases, bug reports, user manuals, etc. should all be documented. There should ideally be a system for easily finding and obtaining documents and determining what documentation will have a particular piece of information. Change management for documentation should be used if possible.
36.What's the big deal about 'requirements'?
One of the most reliable methods of insuring problems, or failure, in a complex software project is to have poorly documented requirements specifications. Requirements are the details describing an application's externally-perceived functionality and properties. Requirements should be clear, complete, reasonably detailed, cohesive, attainable, and testable. A non-testable requirement would be, for example, 'user-friendly' (too subjective). A testable requirement would be something like 'the user must enter their previously-assigned password to access the application'. Determining and organizing requirements details in a useful and efficient way can be a difficult effort; different methods are available depending on the particular project. Many books are available that describe various approaches to this task.
Care should be taken to involve ALL of a project's significant 'customers' in the requirements process. 'Customers' could be in-house personnel or out, and could include end-users, customer acceptance testers, customer contract officers, customer management, future software maintenance engineers, salespeople, etc. Anyone who could later derail the project if their expectations aren't met should be included if possible.
Organizations vary considerably in their handling of requirements specifications. Ideally, the requirements are spelled out in a document with statements such as 'The product shall.....'. 'Design' specifications should not be confused with 'requirements'; design specifications should be traceable back to the requirements.
In some organizations requirements may end up in high level project plans, functional specification documents, in design documents, or in other documents at various levels of detail. No matter what they are called, some type of documentation with detailed requirements will be needed by testers in order to properly plan and execute tests. Without such documentation, there will be no clear-cut way to determine if a software application is performing correctly.
37.What steps are needed to develop and run software tests?
The following are some of the steps to consider:
•Obtain requirements, functional design, and internal design specifications and other necessary documents
•Obtain budget and schedule requirements
•Determine project-related personnel and their responsibilities, reporting requirements, required standards and processes (such as release processes, change processes, etc.)
•Identify application's higher-risk aspects, set priorities, and determine scope and limitations of tests
•Determine test approaches and methods - unit, integration, functional, system, load, usability tests, etc.
•Determine test environment requirements (hardware, software, communications, etc.)
•Determine testware requirements (record/playback tools, coverage analyzers, test tracking, problem/bug tracking, etc.)
•Determine test input data requirements
•Identify tasks, those responsible for tasks, and labor requirements
•Set schedule estimates, timelines, milestones
•Determine input equivalence classes, boundary value analyses, error classes
•Prepare test plan document and have needed reviews/approvals
•Write test cases
•Have needed reviews/inspections/approvals of test cases
•Prepare test environment and testware, obtain needed user manuals/reference documents/configuration guides/installation guides, set up test tracking processes, set up logging and archiving processes, set up or obtain test input data
•Obtain and install software releases
•Perform tests
•Evaluate and report results
•Track problems/bugs and fixes
•Retest as needed
•Maintain and update test plans, test cases, test environment, and testware through life cycle
38.What's a 'test plan'?
A software project test plan is a document that describes the objectives, scope, approach, and focus of a software testing effort. The process of preparing a test plan is a useful way to think through the efforts needed to validate the acceptability of a software product. The completed document will help people outside the test group understand the 'why' and 'how' of product validation. It should be thorough enough to be useful but not so thorough that no one outside the test group will read it. The following are some of the items that might be included in a test plan, depending on the particular project:
•Title
•Identification of software including version/release numbers
•Revision history of document including authors, dates, approvals
•Table of Contents
•Purpose of document, intended audience
•Objective of testing effort
•Software product overview
•Relevant related document list, such as requirements, design documents, other test plans, etc.
•Relevant standards or legal requirements
•Traceability requirements
•Relevant naming conventions and identifier conventions
•Overall software project organization and personnel/contact-info/responsibilties
•Test organization and personnel/contact-info/responsibilities
•Assumptions and dependencies
•Project risk analysis
•Testing priorities and focus
•Scope and limitations of testing
•Test outline - a decomposition of the test approach by test type, feature, functionality, process, system, module, etc. as applicable
•Outline of data input equivalence classes, boundary value analysis, error classes
•Test environment - hardware, operating systems, other required software, data configurations, interfaces to other systems
•Test environment validity analysis - differences between the test and production systems and their impact on test validity.
•Test environment setup and configuration issues
•Software migration processes
•Software CM processes
•Test data setup requirements
•Database setup requirements
•Outline of system-logging/error-logging/other capabilities, and tools such as screen capture software, that will be used to help describe and report bugs
•Discussion of any specialized software or hardware tools that will be used by testers to help track the cause or source of bugs
•Test automation - justification and overview
•Test tools to be used, including versions, patches, etc.
•Test script/test code maintenance processes and version control
•Problem tracking and resolution - tools and processes
•Project test metrics to be used
•Reporting requirements and testing deliverables
•Software entrance and exit criteria
•Initial sanity testing period and criteria
•Test suspension and restart criteria
•Personnel allocation
•Personnel pre-training needs
•Test site/location
•Outside test organizations to be utilized and their purpose, responsibilties, deliverables, contact persons, and coordination issues
•Relevant proprietary, classified, security, and licensing issues.
•Open issues
39.What's a 'test case'?
•A test case is a document that describes an input, action, or event and an expected response, to determine if a feature of an application is working correctly. A test case should contain particulars such as test case identifier, test case name, objective, test conditions/setup, input data requirements, steps, and expected results.
•Note that the process of developing test cases can help find problems in the requirements or design of an application, since it requires completely thinking through the operation of the application. For this reason, it's useful to prepare test cases early in the development cycle if possible.
40.What should be done after a bug is found?
The bug needs to be communicated and assigned to developers that can fix it. After the problem is resolved, fixes should be re-tested, and determinations made regarding requirements for regression testing to check that fixes didn't create problems elsewhere. If a problem-tracking system is in place, it should encapsulate these processes. A variety of commercial problem-tracking/management software tools are available
The following are items to consider in the tracking process:
•Complete information such that developers can understand the bug, get an idea of it's severity, and reproduce it if necessary.
•Bug identifier(number,ID,etc.)
•Current bug status (e.g., 'Released for Retest', 'New', etc.)
•The application name or identifier and version
•The function, module, feature, object, screen, etc. where the bug occurred
•Environment specifics, system, platform, relevant hardware specifics
•Test case name/number/identifier
•One-line bug description
•Full bug description
•Description of steps needed to reproduce the bug if not covered by a test case or if the developer doesn't have easy access to the test case/test script/test tool
•Names and/or descriptions of file/data/messages/etc. used in test
•File excerpts/error messages/log file excerpts/screen shots/test tool logs that would be helpful in finding the cause of the problem
•Severity estimate (a 5-level range such as 1-5 or 'critical'-to-'low' is common)
•Was the bug reproducible?
•Tester name
•Test date
•Bug reporting date
•Name of developer/group/organization the problem is assigned to
•Description of problem cause
•Description of fix
•Code section/file/module/class/method that was fixed
•Date of fix
•Application version that contains the fix
•Tester responsible for retest
•Retest date
•Retest results
•Regression testing requirements
•Tester responsible for regression tests
•Regression testing results
A reporting or tracking process should enable notification of appropriate personnel at various stages. For instance, testers need to know when retesting is needed, developers need to know when bugs are found and how to get the needed information, and reporting/summary capabilities are needed for managers.

No comments: